Ola Electric Roadster 3.5 kWh

The Ola Electric Roadster 3.5 kWh is priced at ₹1,04,999 ex-showroom with an ARAI-certified range of 248 km. Charging: AC charging; official charge time not stated on product page. Specs are sourced from official listings, as of July 2026.

← Ola Electric Roadster: all variants, on-road price & verdict

Sourced

₹1,04,999 (ex-showroom)

sourced from official listings · sourced 2026-07-18 · how we verify

How much does the Ola Electric Roadster Roadster 3.5 kWh cost?

The Ola Electric Roadster Roadster 3.5 kWh is priced at ₹1,04,999 ex-showroom in India (as of 2026-07-18). This excludes RTO registration, insurance, and any state EV subsidy; on-road price varies by state.

Full specifications

ARAI range248 km
Model Familyola-roadster
Body Stylemotorcycle
Battery3.5 kWh
Charging NoteAC charging; official charge time not stated on product page
Motor power13 kW
Top speed126 km/h

Subsidy: Eligible for PM E-Drive incentive where applicable; benefit varies by state EV policy

Pros

Cons

On-road price in your city

  • Ex-showroom₹1,04,999
  • Road tax waived for EVs₹0
  • Registration waived for EVs₹0
  • Insurance (est.)₹2,100
  • State EV subsidy₹30,000
Estimated on-road, Delhi₹77,099

EV road tax & registration are waived in Delhi.

Estimate as of July 2026. Includes ex-showroom, road tax, registration and an insurance estimate, less any state EV subsidy; excludes dealer handling. Delhi EV Policy: road tax and registration waived for EVs; e-2W get up to a ₹30,000 purchase subsidy (ex-factory up to ₹2.25 lakh). No direct cash subsidy for e-cars. source.

Cost of ownership

Based on 40 km/day, the Ola Electric Roadster Roadster 3.5 kWh costs about ₹320/month to run versus ₹2,800/month for a comparable petrol scooter, a saving of ₹30,174/year at July 2026 prices.

You save / month
₹2,480
Per year
₹30,174
Over 5 years
₹1,50,870
MonthlyAnnual5-year
Petrol₹2,800₹34,067₹1,70,335
EV₹320₹3,893₹19,465
You save₹2,480₹30,174₹1,50,870

Assumes 45 km/l petrol, 30 km/kWh EV, ₹105/l petrol and ₹8/kWh electricity, 40 km/day. Figures as of July 2026.

Get the on-road price

Get the on-road price

Verification: sourced - sourced 2026-07-18 · how we verify